Week 12: 15th October – 22nd October:

By s4100986

Plans for this week:

The plans for this week were the filming and post production

 

Achievements for the week:

The achievements for this week were numerous first of all we were lucky enough to be able to get the good camera for a few days which allowed us to film in wide-screen. The filming took us about 3 afternoons which was much longer then I had originally thought it would take. I then spent long long hours editing for about 3 days or so. Cory did the sound tracks and then we compiled in after effects with the text and credits put over the top. Then we made a DVD menu. Good times

 

Plans for next week:

Sleep and present.

Leave a Reply